2K Polymer Systems – Corporate Facility

New build for liquid chemicals facility.

Delivered through ‘Design and Build’ working in partnership with the client’s engineering team to deliver a new ‘bulk storage’ facility for liquid chemicals. VCL designed, managed and delivered all Civil engineering elements of the project and co-ordinated installation of the storage tanks (supplied and delivered by a specialist). We worked closely with the clients ‘in-house’ engineers to integrate our design with their chemical distribution infrastructure.

Works/Services provided:

  • Ground investigation
  • Civil and structural design 
  • Bulk excavation and muck shift
  • Reinforced ‘Cast in-situ’ raft foundation
  • Blockwork containment bund
  • Chemically resistant bund liner
  • Tank Lift BWIC Chemical distribution pipework
  • Galvanised steel access gantry
  • Safety Handrailing & pedestrian gates
Value:
£105,000
Length of Contact:
2 Months
Type:
New Builds