North Sherwood Street

Timeframe: 52 Weeks

Project Value: £1,745,000

Client: House of Brass

Architect: Okrafo-Smart Architects

Revitalising North Sherwood Street.

Vaughandale Construction was proud to deliver a transformative project at North Sherwood Street, turning a bustling Nottingham location into a modern student accommodation complex. This ambitious development combined two key elements: a new-build extension and significant renovation work on the existing structure.

The new-build portion involved traditional beam and block construction, brick and block walls, and a timber pitched roof with dormer faces, providing a contemporary yet robust addition to the property. Meanwhile, the renovation required a full strip-out, including the removal of existing stairs, walls, windows, and the roof structure, followed by the installation of a new third floor and dormer roof to match the extension.

The finished property offers a unified and functional student housing facility, complete with a bike store and plant room to meet the modern needs of its residents.

Overcoming Urban Challenges.

Working on a small site in the heart of Nottingham presented unique challenges. Located on a busy street with a mix of residential and commercial properties, the lack of on-site parking or permits required careful logistics planning. Deliveries were meticulously timed to avoid disruption, and strict adherence to restricted working hours (8am–5pm) ensured minimal impact on neighbours.

Additionally, the team worked closely with Acute Acoustics Ltd to address noise reduction during construction, incorporating measures that would ensure the final building met stringent soundproofing standards for its future residents.


Balancing the complexities of this city-centre site with the need to deliver high-quality student accommodation was a rewarding challenge. By coordinating closely with the client and other stakeholders, we were able to ensure a smooth process and an outstanding result.”

Vaughandale Construction Manager


Vaughandale delivered a project that exceeded our expectations, not just in terms of quality but in their ability to manage the challenges of an urban site. Their attention to detail, from energy efficiency to ensuring the comfort of future residents, has resulted in a property that will stand the test of time. The team was professional and collaborative every step of the way.
House of Brass Representative

Sustainable and Energy-Efficient Features.

Sustainability was a cornerstone of this project, with Vaughandale integrating several energy-saving and environmentally conscious systems:
  • Air source heat pumps and solar PV panels (subject to planning conditions), supporting renewable energy use.
    Energy-efficient wet central heating systems, designed to maintain optimal temperatures across communal areas and staircases.
  • Advanced ventilation systems, combining natural and mechanical methods for improved air quality.
    Low-pressure hot water pipework systems and independent hot water cylinders in each flat, ensuring efficiency and reliability.
  • LED lighting throughout all apartments and communal areas, with photocell sensors and dimming controls to further reduce energy consumption.
    Noise and vibration reduction measures, including antivibration mountings and thermal expansion accommodation.
These measures not only enhance the comfort and usability of the building but also contribute to long-term energy savings, aligning with the client’s commitment to sustainability.

Social Value: A Greener Community.

The project incorporated a tree protection plan to ensure the preservation of existing greenery on-site, reflecting a commitment to enhancing the surrounding environment. By providing a secure bike store, the development encourages sustainable transport options for its residents.

Additionally, the high-spec design prioritises the well-being of future tenants with energy-efficient systems, modern security features, and independent fire alarm systems for each flat, linked to the main building for added safety.

Excellence in Urban Development.

The completion of North Sherwood Street showcases Vaughandale Construction’s expertise in combining complex urban renovation and new-build elements into a cohesive, functional space. By prioritising sustainability, quality, and collaboration, this project sets a benchmark for modern student accommodation in Nottingham.